Follow
Tao Cheng
Tao Cheng
Verified email at gatech.edu
Title
Cited by
Cited by
Year
Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications
T Cheng, J Teizer
Automation in construction 34, 3-15, 2013
4372013
Location tracking and data visualization technology to advance construction ironworkers' education and training in safety and productivity
J Teizer, T Cheng, Y Fang
Automation in construction 35, 53-68, 2013
3062013
Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments
T Cheng, M Venugopal, J Teizer, PA Vela
Automation in construction 20 (8), 1173-1184, 2011
2982011
Data Fusion of Real‐Time Location Sensing (RTLS) and Physiological Status Monitoring (PSM) for Ergonomics Analysis of Construction Workers
T Cheng, GC Migliaccio, J Teizer, UC Gatti
Journal of Computing in Civil Engineering 1, 163, 2012
228*2012
Automated task-level activity analysis through fusion of real time location sensors and worker's thoracic posture data
T Cheng, J Teizer, GC Migliaccio, UC Gatti
Automation in Construction 29, 24-39, 2013
2192013
Proximity hazard indicator for workers-on-foot near miss interactions with construction equipment and geo-referenced hazard areas
J Teizer, T Cheng
Automation in construction 60, 58-73, 2015
1232015
Modeling Tower Crane Operator Visibility to Minimize the Risk of Limited Situational Awareness
T Cheng, J Teizer
Journal of Computing in Civil Engineering, 2012
1072012
Automated Trajectory and Path Planning Analysis Based on Ultra Wideband Data
T Cheng, U Mantripragada, J Teizer, PA Vela
Journal of Computing in Civil Engineering 1, 79, 2011
642011
A performance evaluation of vision and radio frequency tracking methods for interacting workforce
J Yang, T Cheng, J Teizer, PA Vela, ZK Shi
Advanced Engineering Informatics 25 (4), 736-747, 2011
622011
Laser scanning for safe equipment design that increases operator visibility by measuring blind spots
ED Marks, T Cheng, J Teizer
Journal of construction engineering and management 139 (8), 1006-1014, 2013
442013
Real-time data collection and visualization technology in construction
T Cheng, J Teizer
Construction Research Congress 2010: Innovation for Reshaping Construction …, 2010
252010
Hazardous proximity zone design for heavy construction excavation equipment
X Shen, E Marks, N Pradhananga, T Cheng
Journal of Construction Engineering and Management 142 (6), 05016001, 2016
242016
Automated construction resource location tracking to support the analysis of lean principles
T Cheng, J Yang, J Teizer, PA Vela
Proceedings of the Annual Conference of the International Group for Lean …, 2010
222010
Collision probability analysis and application of cataloged space debris
C Tao, L Jing, W Ronglan, YU Youcheng
空间科学学报 26 (6), 452-458, 2006
222006
Automatic Identification of Unsafe Bending Behavior of Construction Workers using Real-time Location Sensing and Physiological Status Monitoring
GC Migliaccio, J Teizer, T Cheng, UC Gatti
Construction Research Congress 2012@ sConstruction Challenges in a Flat …, 0
21*
CRANE OPERATOR VISIBILITY OF GROUND OPERATIONS
T Cheng, J Teizer
13*
Data fusion of real-time location sensing (RTLS) and physiological status monitoring (PSM) for ergonomics analysis of construction workers
GC Migliaccio, T Cheng, UC Gatti, J Teizer
the 19th Triennial CIB World Building Congress, Brisbane, Queensland, Australia, 2013
92013
Real-time spatial location tracking of construction resources in lay down yards
M Venugopal, T Cheng, J Teizer
Construction Research Congress 2010: Innovation for Reshaping Construction …, 2010
72010
Proximity hazard indicator for near miss location recording and mapping of workers-on-foot interactions with construction equipment and geo-referenced hazard areas
J Teizer, T Cheng
Automation in Construction 60, 58-73, 2015
62015
Automating the task-level construction activity analysis through fusion of real time location sensors and workers' thoracic posture data
T Cheng, J Teizer, GC Migliaccio, U Gatti
Computing in Civil Engineering (2013), 629-636, 2013
62013
The system can't perform the operation now. Try again later.
Articles 1–20