Clash relevance prediction based on machine learning Y Hu, D Castro-Lacouture Journal of computing in civil engineering 33 (2), 04018060, 2019 | 81 | 2019 |
A review of computing-based automated fault detection and diagnosis of heating, ventilation and air conditioning systems J Chen, L Zhang, Y Li, Y Shi, X Gao, Y Hu Renewable and Sustainable Energy Reviews 161, 112395, 2022 | 71 | 2022 |
Holistic clash detection improvement using a component dependent network in BIM projects Y Hu, D Castro-Lacouture, CM Eastman Automation in Construction 105, 102832, 2019 | 60 | 2019 |
A meta-model-based optimization approach for fast and reliable calibration of building energy models J Chen, X Gao, Y Hu, Z Zeng, Y Liu Energy 188, 116046, 2019 | 52 | 2019 |
Times series forecasting for urban building energy consumption based on graph convolutional network Y Hu, X Cheng, S Wang, J Chen, T Zhao, E Dai Applied Energy 307, 118231, 2022 | 43 | 2022 |
Automatic clash correction sequence optimization using a clash dependency network Y Hu, D Castro-Lacouture, CM Eastman, SB Navathe Automation in Construction 115, 103205, 2020 | 25 | 2020 |
Lean manufacturing applications in prefabricated construction projects J Du, J Zhang, D Castro-Lacouture, Y Hu Automation in Construction 150, 104790, 2023 | 20 | 2023 |
Machine Learning Applications in Facility Life-cycle Cost Analysis: A Review X Gao, P Pishdad-Bozorgi, D Shelden, Y Hu Proceedings of the ASCE 2019 International Conference on Computing in Civil …, 2019 | 16 | 2019 |
Component Change List Prediction for BIM-Based Clash Resolution from a Graph Perspective Y Hu, D Castro-Lacouture, CM Eastman, SB Navathe Journal of Construction Engineering and Management 147 (8), 04021085, 2021 | 14 | 2021 |
A BIM-based coordination support system for emergency response Y Feng, J Wang, H Fan, Y Hu IEEE Access 9, 68814-68825, 2021 | 12 | 2021 |
Toward intelligent workplace: prediction-enabled proactive planning for human-robot coexistence on unstructured construction sites D Hu, S Li, J Cai, Y Hu 2020 Winter Simulation Conference (WSC), 2412-2423, 2020 | 9 | 2020 |
Clash Relevance Prediction in BIM-Based Design Coordination Using Bayesian Statistics Y Hu, D Castro-Lacouture Construction Research Congress 2018, 649-658, 2018 | 9 | 2018 |
Community time-activity trajectory modeling based on Markov chain simulation and Dirichlet regression C Xia, Y Hu, J Chen Computers, Environment and Urban Systems 100, 101933, 2023 | 8 | 2023 |
A comprehensive optimization framework for the design of high-performance building systems Z Zeng, D Lu, Y Hu, G Augenbroe, J Chen Journal of Building Engineering 65, 105709, 2023 | 7 | 2023 |
Clash context representation and change component prediction based on graph convolutional network in MEP disciplines Y Hu, C Xia, J Chen, X Gao Advanced Engineering Informatics 55, 101896, 2023 | 7 | 2023 |
Sensor cost-effectiveness analysis for data-driven fault detection and diagnostics in commercial buildings L Zhang, M Leach, J Chen, Y Hu Energy 263, 125577, 2023 | 6 | 2023 |
Assistance from the Ambient Intelligence: Cyber–physical system applications in smart buildings for cognitively declined occupants X Gao, S Alimoradi, J Chen, Y Hu, S Tang Engineering Applications of Artificial Intelligence 123, 106431, 2023 | 5 | 2023 |
Holistic Clash Resolution Improvement Using Spatial Networks Y Hu, D Castro-Lacouture, CM Eastman Computing in Civil Engineering 2019: Visualization, Information Modeling …, 2019 | 5 | 2019 |
Digital twin for healthy indoor environment: A vision for the post-pandemic era J Cai, J Chen, Y Hu, S Li, Q He Frontiers of Engineering Management, 1-19, 2023 | 3 | 2023 |
BIM-Enabled Clash Resolution Optimization Based on Clash Dependent Networks Y Hu, D Castro-Lacouture, CM Eastman Construction Research Congress 2020: Computer Applications, 668-677, 2020 | 3 | 2020 |