Follow
Yelda Turkan
Title
Cited by
Cited by
Year
The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components
F Bosché, M Ahmed, Y Turkan, CT Haas, R Haas
Automation in Construction 49, 201-213, 2015
5612015
Automated progress tracking using 4D schedule and 3D sensing technologies
Y Turkan, F Bosche, CT Haas, R Haas
Automation in construction 22, 414-421, 2012
4682012
Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system
F Bosché, A Guillemet, Y Turkan, CT Haas, R Haas
Journal of computing in civil engineering 28 (4), 05014004, 2014
2522014
IFC BIM-based facility management approach to optimize data collection for corrective maintenance
F Shalabi, Y Turkan
Journal of performance of constructed facilities 31 (1), 04016081, 2017
1802017
Mobile augmented reality for teaching structural analysis
Y Turkan, R Radkowski, A Karabulut-Ilgu, AH Behzadan, A Chen
Advanced Engineering Informatics 34, 90-100, 2017
1702017
Toward automated earned value tracking using 3D imaging tools
Y Turkan, F Bosché, CT Haas, R Haas
Journal of construction engineering and management 139 (4), 423-433, 2013
1522013
A BIM-based simulation framework for fire safety management and investigation of the critical factors affecting human evacuation performance
Q Sun, Y Turkan
Advanced Engineering Informatics 44, 101093, 2020
1282020
Bridge construction progress monitoring using lidar and 4D design models
N Puri, Y Turkan
Automation in Construction 109, 102961, 2020
1102020
Adaptive wavelet neural network for terrestrial laser scanner-based crack detection
Y Turkan, J Hong, S Laflamme, N Puri
Automation in construction 94, 191-202, 2018
862018
Tracking of secondary and temporary objects in structural concrete work
Y Turkan, FN Bosche, CT Haas, H Ralph
Construction Innovation: Information, Process, Management 14 (2), 2014
792014
System requirements for electrically conductive concrete heated pavements
H Abdualla, H Ceylan, S Kim, K Gopalakrishnan, PC Taylor, Y Turkan
Transportation Research Record 2569 (1), 70-79, 2016
702016
BrIM and UAS for bridge inspections and management
Y Xu, Y Turkan
Engineering, Construction and Architectural Management 27 (3), 785-807, 2020
662020
Lessons from using BIM to increase design-construction integration
GP Luth, A Schorer, Y Turkan
Practice periodical on structural design and construction 19 (1), 103-110, 2014
562014
Assessment of compliance of dimensional tolerances in concrete slabs using TLS data and the 2D continuous wavelet transform
N Puri, E Valero, Y Turkan, F Bosché
Automation in construction 94, 62-72, 2018
532018
Tracking secondary and temporary concrete construction objects using 3D imaging technologies
Y Turkan, F Bosché, CT Haas, R Haas
Computing in Civil Engineering (2013), 749-756, 2013
512013
Insidious safety threat of fatigue: Investigating construction workers’ risk of accident due to fatigue
M Namian, F Taherpour, E Ghiasvand, Y Turkan
Journal of construction engineering and management 147 (12), 04021162, 2021
492021
Toward Automated Spatial Change Analysis of MEP Components using 3D Point Clouds and As-Designed BIM Models
VS Kalasapudi, Y Turkan, P Tang
2014 Workshop on 3D Computer Vision in the Built Environment, 2014
472014
Revealing safety risks of unmanned aerial vehicles in construction
M Namian, M Khalid, G Wang, Y Turkan
Transportation research record 2675 (11), 334-347, 2021
462021
Scan-to-BIM – An Overview of the Current State of the Art and a Look Ahead
H Son, C Kim, Y Turkan
2015 The International Symposium on Automation and Robotics in Construction …, 2015
462015
Civil integrated management: An emerging paradigm for civil infrastructure project delivery and management
F Guo, CT Jahren, Y Turkan, H David Jeong
Journal of Management in Engineering 33 (2), 04016044, 2017
432017
The system can't perform the operation now. Try again later.
Articles 1–20