Follow
Antonio Gomes Martins
Antonio Gomes Martins
Professor of Electrical Engineering, University of Coimbra
Verified email at uc.pt
Title
Cited by
Cited by
Year
A multiple objective mixed integer linear programming model for power generation expansion planning
CH Antunes, AG Martins, IS Brito
Energy 29 (4), 613-627, 2004
2482004
Energy efficient building design using sensitivity analysis—A case study
PFAF Tavares, AMOG Martins
Energy and Buildings 39 (1), 23-31, 2007
1552007
MCDA and energy planning
D Diakoulaki, CH Antunes, A Gomes Martins
Multiple criteria decision analysis: state of the art surveys, 859-890, 2005
1542005
Evaluation of electrochromic windows impact in the energy performance of buildings in Mediterranean climates
PF Tavares, AR Gaspar, AG Martins, F Frontini
Energy Policy 67, 68-81, 2014
1432014
NSGA-II with local search for a multi-objective reactive power compensation problem
DF Pires, CH Antunes, AG Martins
International Journal of Electrical Power & Energy Systems 43 (1), 313-324, 2012
1412012
A multiple objective approach to direct load control using an interactive evolutionary algorithm
A Gomes, CH Antunes, AG Martins
IEEE Transactions on Power Systems 22 (3), 1004-1011, 2007
1412007
Designing the input vector to ANN-based models for short-term load forecast in electricity distribution systems
PJ Santos, AG Martins, AJ Pires
International Journal of Electrical Power & Energy Systems 29 (4), 338-347, 2007
1102007
Structuring an MCDA model using SSM: A case study in energy efficiency
LP Neves, LC Dias, CH Antunes, AG Martins
European Journal of Operational Research 199 (3), 834-845, 2009
1072009
Control criteria of electrochromic glasses for energy savings in mediterranean buildings refurbishment
P Tavares, H Bernardo, A Gaspar, A Martins
Solar Energy 134, 236-250, 2016
1032016
A multi-criteria decision approach to sorting actions for promoting energy efficiency
LP Neves, AG Martins, CH Antunes, LC Dias
Energy Policy 36 (7), 2351-2363, 2008
972008
A multiple objective decision support model for the selection of remote load control strategies
H Jorge, CH Antunes, AG Martins
IEEE Transactions on Power Systems 15 (2), 865-872, 2000
972000
A multi-objective evolutionary algorithm for reactive power compensation in distribution networks
CH Antunes, DF Pires, C Barrico, A Gomes, AG Martins
Applied Energy 86 (7-8), 977-984, 2009
952009
A multiobjective model for VAR planning in radial distribution networks based on tabu search
DF Pires, AG Martins, CH Antunes
IEEE Transactions On Power Systems 20 (2), 1089-1094, 2005
842005
A multiple objective evolutionary approach for the design and selection of load control strategies
A Gomes, CH Antunes, AG Martins
IEEE Transactions on Power Systems 19 (2), 1173-1180, 2004
842004
A multiple objective linear programming approach to power generation planning with demand-side management (DSM)
AG Martins, D Coelho, CH Antunes, J Clímaco
International Transactions in Operational Research 3 (3-4), 305-317, 1996
821996
The challenging paradigm of interrelated energy systems towards a more sustainable future
RG N.Soares, A.G.Martins, A.L.Carvalho, C.Caldeira, C.Du, É.Castanheira, E ...
Renewable and Sustainable Energy Reviews 95, 171–193, 2018
742018
Source reliability in a combined wind-solar-hydro system
AT De Almeida, A Martins, H Jesus, J Climaco
IEEE Transactions on Power Apparatus and Systems, 1515-1520, 1983
721983
A multiple objective linear programming model for power generation expansion planning
J Clímaco, C Henggeler Antunes, A Gomes Martins, A Traca Almeida
International Journal of Energy Research 19 (5), 419-432, 1995
631995
Development and application of competencies for graduate programs in energy and sustainability
SA Batterman, AG Martins, CH Antunes, F Freire, MG da Silva
Journal of Professional Issues in Engineering Education & Practice 137 (4 …, 2011
552011
Using SSM to rethink the analysis of energy efficiency initiatives
LMP Neves, AG Martins, CH Antunes, LC Dias
Journal of the Operational Research Society 55 (9), 968-975, 2004
432004
The system can't perform the operation now. Try again later.
Articles 1–20