Follow
Tatiane Marin, PhD.
Tatiane Marin, PhD.
Professor at Department of Metallurgy and Materials Engineering, Federico Santa María Technical
Verified email at usm.cl
Title
Cited by
Cited by
Year
An estimation of the artisanal small-scale production of gold in the world
J Seccatore, M Veiga, C Origliasso, T Marin, G De Tomi
Science of the Total Environment 496, 662-667, 2014
3232014
A practical approach for the management of resources and reserves in Small-Scale Mining
J Seccatore, T Marin, G De Tomi, M Veiga
Journal of Cleaner Production 84, 803-808, 2014
552014
Gold losses and mercury recovery in artisanal gold mining on the Madeira River, Brazil
M Balzino, J Seccatore, T Marin, G De Tomi, MM Veiga
Journal of Cleaner Production 102, 370-377, 2015
542015
Economic feasibility of responsible small-scale gold mining
T Marin, J Seccatore, G De Tomi, M Veiga
Journal of Cleaner Production 129, 531-536, 2016
172016
Modelagem de dados de entrada para simulação estocástica de lavra
T Marin, GFC Tomi
Rem: Revista Escola de Minas 63, 559-562, 2010
152010
Resistivity and induced polarization to support morphological modeling in limestone mining
AC Martins, V Elis, G Tomi, J Bettencourt, T Marin
Geofísica internacional 55 (4), 227-238, 2016
142016
Data modeling for stochastic mine simulation
T Marin, GFC Tomi
Rem: Revista Escola de Minas 63, 559-562, 2010
62010
UTILIZAÇÃO DE DADOS DO SISTEMA DE DESPACHO PARA ESTIMATIVA DE PRODUTIVIDADE DE TRANSPORTE NO PLANO DE LAVRA DE CURTO PRAZO
ACMM Campelo, T Marin, GFC de Tomi
Tecnologia em Metalurgia, Materiais e Mineração 2 (n. 2, abr.-jun.), 2018
52018
Impacto da variabilidade operacional na execução do plano de lavra.
T Marin
Universidade de São Paulo, 2009
42009
The impact of payload truck factor use in mine performance reports for an open pit copper mine in Brazil
ACMM Campelo, T Marin
REM-International Engineering Journal 71, 443-449, 2018
32018
DISPATCH SYSTEM DATA USAGE FOR FOR SHORT-TERM MINE PLAN HAULAGE PRODUCTIVITY ESTIMATION/UTILIZAÇÃO DE DADOS DO SISTEMA DE DESPACHO PARA ESTIMATIVA DE PRODUTIVIDADE DE …
ACMM Campelo, T Marin, GFC Tomi
Tecnologia em Metalurgia, Materiais e Mineração 15 (2), 86, 2018
32018
Simulation-based risk quantification: a reconciliation-based performance analysis
S Freitas, G de Tomi, T Marin, MM Rocha
Mining Technology 126 (2), 96-103, 2017
32017
Influence of blasting charges and delays on the energy consumption of mechanical crushing
MA Dragano, J Seccatore, M Cardu, T Marin, J Bettencourt
REM-International Engineering Journal 72, 345-352, 2019
22019
The effect of drilling and blasting performance on fragmentation in a quarry and time for loading, secondary breakage and crushing
T Marin, E Melo, J Seccatore, M Cardu, F Galvão, A Rezende, ...
11th International Symposium on Rock Fragmentation by Blasting, 355-361, 2015
12015
Application of geophysics for mineral exploration in small-scale mining
RM Tichauer, T Marin, AC Martins, GFC De Tomi, VR Elis
VIII CBMINA, 2014
12014
Aplicabilidade do método de lavra “Longwall top coal caving” nas jazidas de carvão na região sul do Brasil
J Seccatore, T Marin, G De Tomi
Recuperado em< http://www. ufrgs. br/rede-carvao/Sess% C3% B5es_A1_A2_A3 …, 2012
12012
The Role of Delays in the Performance of Blasting
JE Seccatore, S Vigna, T Marin, M Cardu
Preprints, 2024
2024
Mapping the Reality of Hg-Free Artisanal Small-Scale Gold Mining
T Marin, J Seccatore, Y Cheng
Sustainability 15 (17), 13207, 2023
2023
Technical and economic feasibility of small-scale mining in Chile.
T Marín
2021
Mining
MA Dragano, J Seccatore, M Cardu, T Marin, J Bettencourt
2020
The system can't perform the operation now. Try again later.
Articles 1–20