An implementation of smart contracts by integrating BIM and blockchain
A Shojaei, I Flood, HI Moud, M Hatami, X Zhang
Proceedings of the Future Technologies Conference (FTC) 2019: Volume 2, 519-527, 2020
1182020
BIM and basic challenges associated with its definitions, interpretations and expectations
B Abbasnejad, HI Moud
International Journal of Engineering Research and Applications (IJERA) 3 (2 …, 2013
1062013
A hybrid computational approach to estimate solar global radiation: an empirical evidence from Iran
ES Mostafavi, SS Ramiyani, R Sarvar, HI Moud, SM Mousavi
Energy 49, 204-210, 2013
792013
Using 360-degree interactive panoramas to develop virtual representation of construction sites
RE Pereira, HI Moud, M Gheisari
Trabajo presentado en Lean and Computing in Construction Congress (LC3) 1, 2017
402017
Construction delays in Iranian civil engineering projects: An approach to the financial security of construction business
B Abbasnejad, H Izadi Moud
Life Science Journal 10 (2), 2632-2637, 2013
402013
Current and Future Applications of Unmanned Surface, Underwater, and Ground Vehicles in Construction
HI Moud, A Shojaei, I Flood
Construction Research Congress 2018, 106-115, 2018
262018
Quantitative Assessment of Proximity Risks Associated with Unmanned Aerial Vehicles in Construction
H Izadi Moud, I Flood, X Zhang, B Abbasnejad, P Rahgozar, M McIntyre
Journal of Management in Engineering 37 (1), 04020095-1-04020095-13, 2021
232021
Qualitative and Quantitative Risk Analysis of Unmanned Aerial Vehicle Flights over Construction Job Sites
HI Moud, A Shojaei, I Flood, X Zhang, M Hatami
The Eighth International Conference on Advanced Communications and …, 2018
192018
Leadership Functions and Challenges in Virtual Teams-A Review Paper
B Abbasnejad, HI Moud
International Proceedings of Economics Development & Research 45, 2012
172012
Modelling the key enablers of organizational building information modelling (BIM) implementation: An interpretive structural modelling (ISM) approach
B Abbasnejad, MP Nepal, SA Mirhosseini, HI Moud, A Ahankoob
Journal of Information Technology in Construction 26, 974-1008, 2021
152021
Proof of Concept for the Use of Small Unmanned Surface Vehicle in Built Environment Management
A Shojaei, HI Moud, I Flood
Construction Research Congress 2018, 116-126, 2018
152018
Qualitative assessment of indirect risks associated with Unmanned Aerial Vehicle flights over construction job sites
HI Moud, I Flood, A Shojaei, Y Zhang, X Zhang, M Tadayon, M Hatami
ASCE International Conference on Computing in Civil Engineering 2019, 83-89, 2019
132019
Factors affecting knowledge transfer in project based organizations
HI MOUD, B Abbasnejad
11th International Conference of the Asia Chapter & 2nd Conference of the …, 2012
13*2012
Qualitative and Quantitative Risk Analysis of Unmanned Aerial Vehicle Flights on Construction Job Sites: A Case Study
H Izadi Moud, X Zhang, I Flood, A Shojaei, Y Zhang, C Capano
International Journal on Advances in Intelligent Systems 12 (3 & 4), 135-146, 2019
102019
Monte Carlo Based Risk Analysis of Unmanned Aerial Vehicle Flights over Construction Job Sites
H Izadi Moud, A Shojaei, I Flood
The 9th International Conference on Simulation & Modeling Methodologies …, 2018
10*2018
Coupling wireless sensor networks and unmanned aerial vehicles in bridge health monitoring systems
HI Moud, M Gheisari
ISARC 2016–33rd International Symposium on Automation and Robotics in …, 2016
102016
A cost model to evaluate the economic performance of contour crafting
X Zhang, I Flood, Y Zhang, HI Moud, M Hatami
ASCE International Conference on Computing in Civil Engineering 2019, 618-625, 2019
92019
A flight simulator for unmanned aerial vehicle flights over construction job sites
HI Moud, MA Razkenari, I Flood, C Kibert
Advances in Informatics and Computing in Civil and Construction Engineering …, 2019
92019
Sustainability Assessment of Data Centers Beyond LEED
H Izadi Moud, H Hakim, C Kibert, I Flood, J Hariharan
IEEE Green Technologies, 2020
7*2020
Integrating BIM and Lean in the design phase
HI Moud
Chalmers University of Technology, Sweden, 2013
62013