A hybrid genetic algorithm for the discrete time–cost trade-off problem R Sonmez, ÖH Bettemir Expert Systems with Applications 39 (13), 11428-11434, 2012 | 160 | 2012 |
Hybrid genetic algorithm with simulated annealing for resource-constrained project scheduling ÖH Bettemir, R Sonmez Journal of Management in Engineering 31 (5), 04014082, 2015 | 79 | 2015 |
Network analysis algorithm for the solution of discrete time-cost trade-off problem ÖH Bettemir, M Talat Birgönül KSCE Journal of Civil Engineering 21, 1047-1058, 2017 | 59 | 2017 |
Optimization of time-cost-resource trade-off problems in project scheduling using meta-heuristic algorithms ÖH Bettemir Middle East Technical University, 2009 | 32 | 2009 |
Estimation of duration of earthwork with backhoe excavator by Monte Carlo Simulation B Sağlam, ÖH Bettemir Journal of Construction Engineering 1 (2), 85-94, 2018 | 16 | 2018 |
Experimental design for genetic algorithm simulated annealing for time cost trade-off problems ÖH Bettemir International Journal of Engineering & Applied Sciences (IJEAS) 3 (1), 15-26, 2011 | 15 | 2011 |
Development of BIM software with quantity take-off and visualization capabilities F Ergen, ÖH Bettemir | 11 | 2022 |
Prediction of georeferencing precision of pushbroom scanner images ÖH Bettemir IEEE transactions on geoscience and remote sensing 50 (3), 831-838, 2011 | 10 | 2011 |
Development of spreadsheet based quantity take-off and cost estimation application ÖH Bettemir Journal of Construction Engineering, Management & Innovation 1 (3), 108-117, 2018 | 9 | 2018 |
Sensitivity and error analysis of a differential rectification method for CCD frame cameras and pushbroom scanners ÖH Bettemir Middle East Technical University, 2006 | 9 | 2006 |
Design and manufacture of a small scale autonomous construction machine for grading Ö Bettemir, B Tombaloglu Journal of the Faculty of Engineering and Architecture of Gazi University 28 (3), 2013 | 8* | 2013 |
Differential sensitivity analysis for the orthorectification of small satellite images OH Bettemir 2009 4th International Conference on Recent Advances in Space Technologies …, 2009 | 7 | 2009 |
Detection of railway track from image by heuristic method ÖH Bettemir 2015 23nd Signal Processing and Communications Applications Conference (SIU …, 2015 | 6 | 2015 |
Error estimation of orthorectification of small satellite images by differential sensitivity analysis ÖH Bettemir Journal of Aeronautics and Space Technologies 4 (4), 65-74, 2010 | 6 | 2010 |
Zaman maliyet ödünleşim probleminin en az insan müdahalesi ile oluşturulup çözülmesi O BETTEMİR, T Yücel Uludağ Üniversitesi Mühendislik Fakültesi Dergisi 26 (2), 461-480, 2021 | 5 | 2021 |
İnşaat işlerinin iş programina bağli nakit akişi değişkenliğinin saptanmasi ve düzenlenmesi ÖH Bettemir, E Gündüz, O Akkurt, H Efe, MA Arslan Mühendislik Bilimleri ve Tasarım Dergisi 7 (1), 211-223, 2019 | 5 | 2019 |
Comparison of resource distribution metrics on multi-resource projects ÖH Bettemir, T Erzurum Journal of Construction Engineering, Management & Innovation 2 (2), 93-102, 2019 | 5 | 2019 |
Recommendations on the solution of accommodation problem and recovery after destructive earthquakes ÖH Bettemir International Journal of Emergency Management 12 (2), 168-184, 2016 | 5 | 2016 |
Kaynak Dengeleme Probleminin Arama Uzayını Paralel Programlama ile Tarayarak Kesin Çözümü ÖH BETTEMİR, T ERZURUM Teknik Dergi 32 (3), 10767-10805, 2021 | 4 | 2021 |
İnşaat sürecinin iş çizelgelemesi, yönetimi ve optimizasyonu O BETTEMİR, Ö BULAK Teknik Dergi 33 (6), 12945-12986, 2022 | 3 | 2022 |