Follow
Mostafa Khanzadi
Mostafa Khanzadi
Associate Professor, School of Civil Engineering, Iran University of Science & Technology
Verified email at iust.ac.ir
Title
Cited by
Cited by
Year
Mechanical properties of high-strength concrete incorporating copper slag as coarse aggregate
M Khanzadi, A Behnood
Construction and building materials 23 (6), 2183-2188, 2009
2572009
Assessment of social sustainability indicators in mass housing construction: a case study of Mehr housing project
A Karji, A Woldesenbet, M Khanzadi, M Tafazzoli
Sustainable Cities and Society 50, 101697, 2019
1832019
Integrating system dynamics and fuzzy logic modelling for construction risk management
F Nasirzadeh, A Afshar, M Khanzadi, S Howick
Construction Management and Economics 26 (11), 1197-1212, 2008
1542008
Fuzzy adaptive decision making model for selection balanced risk allocation
G Khazaeni, M Khanzadi, A Afshar
International Journal of Project Management 30 (4), 511-522, 2012
1452012
Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects
M Khanzadi, F Nasirzadeh, M Alipour
Automation in construction 22, 368-376, 2012
1382012
BIM applications toward key performance indicators of construction projects in Iran
M Khanzadi, M Sheikhkhoshkar, S Banihashemi
International Journal of Construction Management 20 (4), 305-320, 2020
1172020
Billiards-inspired optimization algorithm; a new meta-heuristic method
A Kaveh, M Khanzadi, MR Moghaddam
Structures 27, 1722-1739, 2020
1162020
Residual mechanical properties of high-strength concretes after exposure to elevated temperatures
M Ghandehari, A Behnood, M Khanzadi
Journal of materials in Civil Engineering 22 (1), 59-64, 2010
1092010
Modeling social sustainability in construction projects by integrating system dynamics and fuzzy‐DEMATEL method: a case study of highway project
M Rostamnezhad, F Nasirzadeh, M Khanzadi, MJ Jarban, M Ghayoumian
Engineering, construction and architectural management 27 (7), 1595-1618, 2020
782020
A hybrid simulation framework for modelling construction projects using agent-based modelling and system dynamics: an application to model construction workers' safety behavior
F Nasirzadeh, M Khanzadi, M Mir
International Journal of Construction Management 18 (2), 132-143, 2018
752018
An integrated BIM-based approach for cost estimation in construction projects
A Fazeli, MS Dashti, F Jalaei, M Khanzadi
Engineering, Construction and Architectural Management 28 (9), 2828-2854, 2021
722021
Cyclic lateral response of pile foundations in offshore platforms
MM Memarpour, M Kimiaei, M Shayanfar, M Khanzadi
Computers and Geotechnics 42, 180-192, 2012
692012
System dynamics approach for construction risk analysis
F Nasirzadeh, A AFSHAR, ZM KHAN
International Journal of Civil Engineering 6 (2), 120-131, 2008
652008
BIM-integrated TOPSIS-Fuzzy framework to optimize selection of sustainable building components
A Fazeli, F Jalaei, M Khanzadi, S Banihashemi
International Journal of Construction Management 22 (7), 1240-1259, 2022
622022
Proposing a neural network model to predict time and cost claims in construction projects
V Yousefi, SH Yakhchali, M Khanzadi, E Mehrabanfar, J Šaparauskas
Journal of Civil Engineering and Management 22 (7), 967-978, 2016
582016
Optimum risk allocation model for construction contracts: fuzzy TOPSIS approach
G Khazaeni, M Khanzadi, A Afshar
Canadian Journal of Civil Engineering 39 (7), 789-800, 2012
512012
Modelling the social dimension of sustainable development using fuzzy cognitive maps
F Nasirzadeh, M Ghayoumian, M Khanzadi, M Rostamnezhad Cherati
International journal of construction management 20 (3), 223-236, 2020
492020
Fuzzy cognitive map approach to analyze causes of change orders in construction projects
M Khanzadi, F Nasirzadeh, MS Dashti
Journal of Construction Engineering and Management 144 (2), 04017111, 2018
472018
Prediction and improvement of labor productivity using hybrid system dynamics and agent-based modeling approach
M Khanzadi, F Nasirzadeh, M Mir, P Nojedehi
Construction Innovation 18 (1), 2-19, 2018
452018
Building a rough sets-based prediction model for classifying large-scale construction projects based on sustainable success index
S Akbari, M Khanzadi, MR Gholamian
Engineering, Construction and Architectural Management 25 (4), 534-558, 2018
432018
The system can't perform the operation now. Try again later.
Articles 1–20