Follow
Esmaeel Moradi
Esmaeel Moradi
Director of Global Supply Chain Strategy at WESCO
Verified email at wescodist.com
Title
Cited by
Cited by
Year
Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
E Moradi, SMT Fatemi Ghomi, M Zandieh
Expert Systems with Applications 38 (6), 7169-7178, 2011
2032011
An efficient architecture for scheduling flexible job-shop with machine availability constraints
E Moradi, SMT Fatemi Ghomi, M Zandieh
The International Journal of Advanced Manufacturing Technology 51 (1), 325-339, 2010
452010
Single facility location problem
E Moradi, M Bidkhori
Facility location: Concepts, models, algorithms and case studies, 37-68, 2009
432009
Finding a maximum k-club using the k-clique formulation and canonical hypercube cuts
E Moradi, B Balasundaram
Optimization Letters 12 (8), 1947-1957, 2018
372018
Minimizing the makespan and the system unavailability in parallel machine scheduling problem: a similarity-based genetic algorithm
E Moradi, M Zandieh
The International Journal of Advanced Manufacturing Technology 51 (5), 829-840, 2010
322010
Correction to: Finding a maximum k-club using the k-clique formulation and canonical hypercube cuts
Y Lu, E Moradi, B Balasundaram
Optimization Letters 12, 1959-1969, 2018
132018
Competitive location problem
MJ Karimifar, MK Sikarudi, E Moradi, M Bidkhori
Facility location: Concepts, models, algorithms and case studies, 271-294, 2009
112009
Detecting large risk-averse 2-clubs in graphs with random edge failures
F Mahdavi Pajouh, E Moradi, B Balasundaram
Annals of Operations Research 249, 55-73, 2017
92017
Integrated Process Planning and Active Scheduling in a Supply Chain-A Learnable Architecture Approach
E Moradi, A Ayough, M Zandieh
Interdisciplinary Journal of Management Studies (Formerly known as Iranian …, 2019
12019
Quantitative Models in Supply Chain Management
E Moradi, MRG Arsalan, AN Sadigh, HFR Ghalb
Supply Chain Sustainability and Raw Material Management: Concepts and …, 2012
12012
Decomposition algorithms for detecting low-diameter clusters in graphs
E Moradi
Oklahoma State University, 2016
2016
Scheduling integrated flexible job-shop problem with preventive maintenance to minimize makespan and system unavailability
E Moradi, SMTF Ghomi
International Journal of Management Perspective, 2013
2013
Integrated Process Planning and Active Scheduling in a Supply Chain-A Learnable Architecture Approach
M Zandieh, A Ayough, E Moradi
The system can't perform the operation now. Try again later.
Articles 1–13