Follow
Péter Györgyi
Péter Györgyi
Institute for Computer Science and Control (MTA SZTAKI)
Verified email at sztaki.hu
Title
Cited by
Cited by
Year
Approximation schemes for parallel machine scheduling with non-renewable resources
P Györgyi, T Kis
European Journal of Operational Research 258 (1), 113-123, 2017
332017
Approximation schemes for single machine scheduling with non-renewable resource constraints
P Györgyi, T Kis
Journal of Scheduling 17, 135-144, 2014
322014
A probabilistic approach to pickup and delivery problems with time window uncertainty
P Györgyi, T Kis
European Journal of Operational Research 274 (3), 909-923, 2019
262019
Approximability of scheduling problems with resource consuming jobs
P Györgyi, T Kis
Annals of Operations Research 235 (1), 319-336, 2015
262015
Reductions between scheduling problems with non-renewable resources and knapsack problems
P Györgyi, T Kis
Theoretical Computer Science 565, 63-76, 2015
182015
A PTAS for a resource scheduling problem with arbitrary number of parallel machines
P Györgyi
Operations Research Letters 45 (6), 604-609, 2017
132017
Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints
P Györgyi, T Kis
Journal of Scheduling, 2019
122019
Minimizing the maximum lateness on a single machine with raw material constraints by branch-and-cut
P Györgyi, T Kis
Computers & Industrial Engineering 115, 220-225, 2018
122018
Suboptimal and conflict-free control of a fleet of AGVs to serve online requests
M Drótos, P Györgyi, M Horváth, T Kis
Computers & Industrial Engineering 152, 106999, 2021
92021
A common approximation framework for early work, late work, and resource leveling problems
P Györgyi, T Kis
European Journal of Operational Research 286 (1), 129-137, 2020
92020
New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints
P Györgyi, T Kis
Discrete Applied Mathematics 311, 97-109, 2022
52022
A multivariate complexity analysis of the material consumption scheduling problem
M Bentert, R Bredereck, P Györgyi, A Kaczmarczyk, R Niedermeier
Journal of Scheduling, 1-14, 2023
22023
On the number of touching pairs in a set of planar curves
P Györgyi, B Hujter, S Kisfaludi-Bak
Computational Geometry 67, 29-37, 2018
22018
A P2P based storage system with reputation points and simulation results
B Bakondi, P Burcsi, P Györgyi, D Herskovics, P Ligeti, L Mérai, DA Nagy, ...
Central European Conference on Cryptology (CECC), 2014
22014
Scheduling with non-renewable resources
P Györgyi
Eötvös University, 2013
22013
Joint replenishment meets scheduling
P Györgyi, T Kis, T Tamási, J Békési
Journal of Scheduling 26 (1), 77-94, 2023
12023
Approximation algorithms for coupled task scheduling minimizing the sum of completion times
D Fischer, P Györgyi
Annals of Operations Research, 1-22, 2023
2023
An online joint replenishment problem combined with single machine scheduling
P Györgyi, T Kis, T Tamási
arXiv preprint arXiv:2208.02748, 2022
2022
Joint replenishment meets scheduling
T Kis, P Györgyi, T Tamási, J Békési
2022
Joint replenishment meets scheduling
J Békési, P Györgyi, T Kis
2020
The system can't perform the operation now. Try again later.
Articles 1–20